Caltrans has contracted with a New Zealand company to pilot the “dynamic-lane” system on the 110 Freeway where traffic backs up in a tunnel at the single-lane connector to northbound Interstate 5. At peak hours, the “smart studs” would illuminate to automatically open a second connector lane on the 110, easing the long lines.